Sodikin, Imama, et al. “Optimization of Multi Contruction Project Implementation With Limited Human Resource, Time, and Capital Using the Resource Leveling Method”. Engineering And Technology Journal, vol. 8, no. 9, Sept. 2023, pp. 2785-8, doi:10.47191/etj/v8i9.09.