[1]
D. L. Musukwa and E. Luwaya, “Design Optimization of a Run-Of-River Small Hydropower Plant: A Case Study of Mabula Kapi Site”, etj, vol. 9, no. 9, pp. 5040–5059, Sep. 2024.