Sodikin, I. (2023) “Optimization of Multi Contruction Project Implementation with Limited Human Resource, Time, and Capital Using the Resource Leveling Method”, Engineering And Technology Journal, 8(9), pp. 2785–2788. doi: 10.47191/etj/v8i9.09.