Mohamad Sobirin (2024) “Stakeholder Risk Analysis Based on PMBOK to Improve Time Performance of Grand Batavia Tangerang Project”, Engineering And Technology Journal, 9(8), pp. 4943–4949. doi: 10.47191/etj/v9i08.45.