Indra Mahendra Sukardi, and Agung W. Biantoro. 2025. “Analysis of Contract Change Order (CCO) Factors, Cost and Time Factors Affecting Bore Pile Work (Case Study of Cisauk Fly over Construction Project): A Systematic Literature Review”. Engineering And Technology Journal 10 (3):4021-26. https://doi.org/10.47191/etj/v10i03.11.