INDRA MAHENDRA SUKARDI; AGUNG W. BIANTORO. Analysis of Contract Change Order (CCO) Factors, Cost and Time Factors Affecting Bore Pile Work (Case Study of Cisauk Fly over Construction Project): A Systematic Literature Review. Engineering And Technology Journal, [S. l.], v. 10, n. 3, p. 4021–4026, 2025. DOI: 10.47191/etj/v10i03.11. Disponível em: https://everant.org/index.php/etj/article/view/1796. Acesso em: 2 apr. 2025.