RMP LPT MSCM, E. R. S. R. R., & A. Iglesia, RCE MSCM, E. M. (2025). Project Performance Evaluation Using Critical Path Method and Earned Value Management: A Comparative Analysis of Road Maintenance Projects in the 4th District of Camarines Sur. Engineering And Technology Journal, 10(9), 6750–6757. https://doi.org/10.47191/etj/v10i09.05