Indra Mahendra Sukardi, & Agung W. Biantoro. (2025). Analysis of Contract Change Order (CCO) Factors, Cost and Time Factors Affecting Bore Pile Work (Case Study of Cisauk Fly over Construction Project): A Systematic Literature Review. Engineering And Technology Journal, 10(3), 4021–4026. https://doi.org/10.47191/etj/v10i03.11