[1]
Sodikin, I. et al. 2023. Optimization of Multi Contruction Project Implementation with Limited Human Resource, Time, and Capital Using the Resource Leveling Method. Engineering And Technology Journal. 8, 9 (Sep. 2023), 2785–2788. DOI:https://doi.org/10.47191/etj/v8i9.09.