[1]
Mohamad Sobirin 2024. Stakeholder Risk Analysis Based on PMBOK to Improve Time Performance of Grand Batavia Tangerang Project. Engineering And Technology Journal. 9, 8 (Aug. 2024), 4943–4949. DOI:https://doi.org/10.47191/etj/v9i08.45.