Problem Solving and Rehabilitation of the Speleological Object of Larger Dimensions Which Appeared During the Excavation of the "Počitelj" Tunnel
Downloads
The "Počitelj" tunnel was built as part of the section of the highway Mostar North - the border with the Republic of Croatia on the corridor Vc, the section Počitelj - Bijača, the subsection Počitelj - Zvirovići with a length of approx. 11.50 km. The Počitelj tunnel is a two-tube, two-lane tunnel with a length of 1163 m on the right tube and 1192 m on the left tube.
Divel d.o.o. Sarajevo (March 2015): Book C1210 - Geotechnical design of the Počitalj tunnel, Mission G21, Project documentation of the Počitelj – Bijača highway, subsection: Počitelj – Zvirovići (from km 46+200 to km 57+100).
IGH d.o.o. Mostar (July 2020): Geotechnical monitoring of works - Mission G32, Primary support in the right tunnel tube, zone from km 1+175.00 to km 1+166.00, cavern zone, July 2020.
Milanolo, S., Prelić M. (July 2020): Speleological report for the cavern in the Počitelj tunnel.
Šiljeg, Z., Iličić, F., Antičević, H.: Issues and rehabilitation of unforeseen speleological objects during excavation in the tunnels "Sveti Rok", "Plasina" and "Dumbočica", European Conference on Natural building materials and coal: New perspectives, Sarajevo, 2004.
Starčević D., Antičević H., Šošić D.: Prospecting and rehabilitation of unforeseen speleological objects on the route of the future highway "Split (Dugopolje) - Ploče", section "Zagvozd - Ravča", Fourth Congress on Roads, Croatian Road Society, Via Vita, Dubrovnik, 2007.
Arbanas, Ž.: Observational methods in the design and execution of construction pits in rock mass in urban areas, 2015.