Problem Solving and Rehabilitation of the Speleological Object of Larger Dimensions Which Appeared During the Excavation of the "Počitelj" Tunnel

.

Authors

October 25, 2022

Downloads

The "Počitelj" tunnel was built as part of the section of the highway Mostar North - the border with the Republic of Croatia on the corridor Vc, the section Počitelj - Bijača, the subsection Počitelj - Zvirovići with a length of approx. 11.50 km. The Počitelj tunnel is a two-tube, two-lane tunnel with a length of 1163 m on the right tube and 1192 m on the left tube.