Application of Turnaround Maintenance Models in Offshore Crude Oil Production Platform
Downloads
Turn-round maintenance in the oil and gas industry involves a four yearly total facility shut-down for equipment maintenance and overhaul. However, not all equipment qualifies for turnaround maintenance (TAM). Some maintenance can be carried out on the fly, while others can be carefully scheduled to fit into a specific maintenance cycle such as TAM. Weibull analysis was adopted and applied on live data from two Oil and Gas production platform DP-A to determine that equipment by evaluating their Availability, Unavailability, Reliability and Unreliability with beta β factor being the determinant factor for maintenance modelling. “β < 1” implies that reliability growth is occurring (decreasing failure rate- infant mortality); and “β = 0” implies no growth (constant failure rate-random failures). “β > 1” implies that deterioration is occurring (increasing failure rate-wear out) .Results show Beta factor for platform DP-A equipment as follows; Wing Valve positioner 0.95, Wellhead control panel 0.72, FRAMO pump 0.44, HVAC chiller 0.33, Water injection pump 0.95, HPU Compressor 0.74, Choke actuator 0.80, Heater blower fan 0.37. The model present can be used to predict and schedule maintenance on oil and gas production platforms. It is recommended that oil and gas companies should employ this model in their maintenance schedules for offshore production facilities.
Dutta, R., Kundu, G., Mousavi, S., Chakraborty, R., Yomdo. S. and Mandal, A. (2024). Evaluation of potential of CO2-enhanced oil recovery (EOR) and assessment of capacity for geological storage in a mature oil reservoir within upper Assam oil basin, India. Energy and Fuels,(15): 14096 – 14118.
Chakraborty, S., Chatterjee, P. and Des, P. P. (2023). Multi-Criteria Decision-Making Methods in Manufacturing Environments: Models and Application. CRC Press, Boca Raton, Florida, 481p.
Elamvazuthi, I., Al-Alawi, A. I., Al-Habsi, S., and Al-Harthy, A. (2019). Reliability analysisof offshore oil and gas platforms using Weibull distribution. Energies, 12(10): 1930 – 1933.
Zhen, X., Han, Y. and Huang, Y. (2021). Optimization of preventive maintenance intervals integrating risk and cost for safety critical barriers of offshore petroleum installations. Process Safety and Environme
Ebrahimian, B. and Movahed, V. (2017). Application of evolutionary-based approach in evaluating pile bearing capacity using CPT results. Ships and Offshore Structure, 12(7): 937 – 953.
El Werfalli, A. A. (2019). Optimising turnaround maintenance (TAM) scheduling of gas plants in Libya. A PhD Thesis in the University of Bradford, West Yorkshire, England, 168p.
Giannoumis, J. (2021). Drone survey for the protection of natural and built heritage site. Journal of Technological Innovation for Sustainable Development, 3: 1 – 28
Pielke, R. A. and Contant, R. T. (2003). Best practices in prediction for decision-making: Lessons from atmospheric and earth science. Ecology, 84(6): 1351 – 1358.
Tai, J. L., Sultan, M. T. H., Lukaszewicz, A., Shahar, F. S., Oksiuta, Z and Krishnamoorthy R.R. (2024). Enhancing turnaround maintenance in process plants through on-stream phased array corrosion mapping: A review. Applied Sciences, 14(15): 6700 – 6707.
Jade, M. (2023). Figure out and understand the difference between FMEA and FMECA,http://www.mindonmapjournal.pdf. (Retrieved on 24th October 2023).