Operational Risk Management in Precast Concrete Manufacturing: Lessons from The Probowangi Plant Indonesia
Downloads
Precast concrete manufacturing plays a vital role in accelerating infrastructure development, yet its operational phase is often exposed to significant risks that can compromise efficiency, safety, and quality. This study develops and implements a structured risk management framework for the Probowangi Precast Plant in East Java, Indonesia—an industrial facility supplying components for major toll road projects. Using ISO 31000:2018 and ISO 31010:2019 as references and adopting a mixed-method approach, this study identified risks through expert interviews and literature review, then validated and prioritized them using the Probability Impact Matrix (PIM). From an initial list of 32 risks, 18 were confirmed as high-priority based on expert evaluation. These included material shortages, labor skill gaps, equipment failures, and safety violations. Tailored mitigation strategies were formulated in alignment with international standards and operational constraints, covering areas such as supplier diversification, training programs, and enhanced stock management. The study contributes a replicable model for operational risk governance in precast manufacturing, especially relevant for developing countries seeking to improve construction efficiency through prefabrication technologies.
Chang, R., Zhang, N., & Gu, Q. (2023). A review on mechanical and structural performances of precast concrete buildings. Buildings, 13(7), 1575.
Hillson, D., & Murray-Webster, R. (2017). Understanding and managing risk attitude (2nd ed.). Routledge.
International Organization for Standardization. (2018). ISO 31000:2018 Risk management – Guidelines. https://www.iso.org/standard/65694.html
International Organization for Standardization. (2019). ISO 31010:2019 Risk management — Risk assessment techniques. https://www.iso.org/standard/72140.html
Jayady, A., & Moerdianto, E. (2022). Risk management of time control on the construction of Saumlaki Port. Indonesian Journal of Multidisciplinary Science, 1(12), 1581–1597. https://doi.org/10.55324/ijoms.v1i12.239
Jayady, A., Sudiarto, P., & Suryani, F. (2022). Operational risk management in the Cibitung Metland Waterland building on investment costs. Indonesian Journal of Multidisciplinary Science, 1(12), 1612–1628. https://doi.org/10.55324/ijoms.v1i12.231
Kamardeen, I., & Loosemore, M. (2016). Knowledge-based risk identification in the early design stage of construction projects. International Journal of Project Management, 34(5), 839–848. https://doi.org/10.1016/j.ijproman.2016.03.001
Kassem, A., Khoiry, M. A., & Hamzah, N. (2019). Using probability impact matrix (PIM) in analyzing risk factors affecting the success of oil and gas construction projects in Yemen. International Journal of Energy Sector Management, 14(3), 527–546. https://doi.org/10.1108/IJESM-03-2019-0011
Mohamed, S., Ali, A. S., & Mat Yusof, M. Z. (2020). Risk management practices in construction projects: A case study in Malaysian government agencies. Journal of Engineering, Design and Technology, 18(1), 80–96. https://doi.org/10.1108/JEDT-03-2019-0068
Okoli, C., & Pawlowski, S. D. (2004). The Delphi method as a research tool: An example, design considerations and applications. Information & Management, 42(1), 15–29. https://doi.org/10.1016/j.im.2003.11.002
Yin, R. K. (2018). Case study research and applications: Design and methods (6th ed.). Sage Publications. Zhang, Y., Hammad, A. W., & Liu, H. (2020). Risk management in off-site construction: A literature review. Journal of Cleaner Production, 273, 122869. https://doi.org/10.1016/j.jclepro.2020.122869