Analysis of the Level of Satisfaction and Importance of Contractor Performance Factors on Construction Projects
Downloads
In the midst of increasingly tight competition in the construction world, every contractor company is required to be able to demonstrate the quality of its services so that it can excel in the competition. As a company engaged in the service sector, construction companies must have knowledge of quality factors in construction projects, including tangible evidence, reliability, responsiveness, assurance and empathy. If the contractor's performance can meet expectations, stakeholders will be satisfied and vice versa. This study aims to identify contractor performance factors on quality in construction projects. This study uses a quantitative method through the distribution of questionnaires. The respondents used were consultants and owners.
Ali, A., Amin, M., & Husin, A. E. (2019). Key Success Factors for Safety Programs Implementation in Indonesian Construction Projects. Int. J. Civ. Eng. Technol, 10(2), 1385–1394.
Aluonzi, G., N. Oluka, P., & Nduhura, A. (2016). Contract Management and Performance of Road Maintenance Projects: The Case of Arua Municipality. Universal Journal of Management, 4(10), 550–558.
https://doi.org/10.13189/ujm.2016.041004
Amin, M., Alisjahbana, S. W., & Simanjuntak, M. R. (2018). Analysis Model of Master Plan Fire Protection System in Building and Environment in DKI Jakarta-Indonesia. International Journal of Civil Engineering and Technology, 9(11), 60–69.
Eboli, L., & Mazzulla, G. (2007). Service Quality Attributes Affecting Customer Satisfaction for Bus Transit. Journal of Public Transportation, 10(3), 21–34. https://doi.org/10.5038/2375-0901.10.3.2
Ebrahimi, M., & Sadeghi, M. (2013). Quality Management and Performance: An Annotated Review. International Journal of Production Research, 51(18), 5625–5643.
Erlita, A., Amin, M., & Bintoro, B. P. K. (2023). Multiphase Project Risk Management on Food Factory Building Construction: Consultant Perspective. Journal of Construction in Developing Countries, 28(1), 1–17.
Firdaus, H. Y., Isradi, M., Prasetijo, J., Rifqi, M., & Halim, H. (2022). Analysis of Transjakarta Service Performance on the Cibubur-BKN by Servqual Method. European Journal of Science, Innovation and Technology, 2(1), 113–123.
Gransberg, D. D., Popescu, C. M., & Ryan, R. (2006). Construction Equipment Management for Engineers, Estimators, and Owners. CRC Press.
Husin, A. E., & Kristiyanto, B. D. K. (n.d.). Blockchain-BIM: Reducing Cost in Green Retrofitting for Sustainable Construction Development.
Husin, A. E., Kristiyanto, K., Sinaga, L., & Arif, E. J. (2024). Analysis of Critical Factors Affecting Green Office Retrofits Based on the Latest Green Building Regulations in Indonesia. Journal of Infrastructure, Policy and Development, 8(5), 3790.
Isradi, M., Stini, L. O., Dermawan, W. B., & Mufhidin, A. (2021). Analysis of Customer Satisfaction on Service Quality of KRL Bogor - Jakarta. IJTI (International Journal of Transportation and Infrastructure), 5(1), 14–25.
Khoirul, M., & Isradi, M. (2024). Analysis of Pedestrian Satisfaction Level for Sidewalk Revitalization on Jalan Puri Kencana, West Jakarta. Engineering and Technology Journal, 09(08), 4884–4892. https://doi.org/10.47191/etj/v9i08.38
Madani, M. G., Isradi, M., Hidayat, A., Sudrajat, K. M., Yusman, H., & Firdaus, J. P. (2024). Analysis of Service Level of Trans Metro Pasundan Bandung Raya Corridor 2 Based on Importance Performance Analysis and Customer Satisfaction Index.
Ministry of PUPR. (2012). Ministry of Public Works Regulation Number: 05/PRT/M/2012. Ministry of PUPR.
Pamungkas, P. A., & Susetyo, B. (2024). Analysis of Internal and External Factors on Project Performance Based on Risk Management in Smelter Construction. ASTONJADRO, 13(2), 537–549.
Pourrostam, T., & Ismail, A. (2011). Significant Factors Causing and Effects of Delay in Iranian Construction projects. Australian Journal of Basic and Applied Sciences, 5(7), 450–456.
Rauf, R., Wulandari, L. K., & Manaha, Y. P. (2023). Performance Evaluation of Supervisory Consultants on Road Reconstruction Projects in East Kalimantan, Indonesia. 7(2), 13–17.
Shadiq, J., & Isradi, M. (2024). Analysis of Route Choice for Travel Between Bekasi and Jakarta After the Operation of the Becakayu Toll Road. 1198–1202.
Shakeri, H., & Khalilzadeh, M. (2020). Analysis of Factors Affecting Project Communications with a Hybrid DEMATEL-ISM Approach (A Case Study in Iran). Heliyon, 6(8), e04430. https://doi.org/10.1016/j.heliyon.2020.e04430
Sianturi, A. L., & Isradi, M. (2024). Evaluation of Operational Performance and Transjakarta Services Corridor 3F Kalideres-Gelora Bung Karno ( GBK ). 8(8), 83–89.
Sukardi, I. M., & Biantoro, A. W. (2025). Analysis of Contract Change Order (CCO) Factors, which Affect the Fly Over Work (Case Study of The Cisauk Fly Over Development Project). ASTONJADRO, 14(1).
Susetyo, B., Budinata, T., & Bintoro, B. P. K. (2021). Relationship Quality Performance, Rework and Worker Productivity with Customer Satisfaction on Housing Development Project. Int. J. of Sci. & Tech. Research, 10, 24–27.