Selection of the Contractor for the Construction of the Cinere Jagorawi (Cijago) Section Ii Toll Road, West Java Indonesia
Downloads
Choosing a contractor for construction project work is not an easy job, because it requires accuracy in its determination, including in the work of the Cijago Toll Road Section II. Therefore, a method is needed, one of which is the Analytical Hierarchy Process (AHP) method to support decisions taken by the Ministry of PUPR as the Owner. Based on the respondents' assessment using the ahp method in tables 3 and 4 above, it can be seen that the selected contractor is PT.LMA. Because it has the highest value of 0.697 compared to PT.PP (0.245) and PT.HK (0.058). This assessment is based on 10 predetermined criteria.
Budianta, Wawan. (2020). Pemetaan Tanah Longsor di Kecamatan Gedungsari, Kabupaten Gunung Kidul, Yogyakarta dengan Metode Analytical Hierarchy Process (AHP). Indonesian Journal of Community Engagement. Vol 6, No. 2, P 68-73. DOI: 10.22146/jkpm.45637.
Saaty, T.L. (2008). Decision Making with The Analytical Hierarchy Process Int. J. Services Sciences., 1(1), 83. DOI:10.1504/IJSSCI.2008.017590.
Cahyana. Nur Heri. (2010). Teknik Pemodelan AHP sebagai Pendukung Keputusan. Telematika. Vol 6. No 2. P 49 – 58. ISSN 1829-667X.
Oktapiani, Renny, Subakti, Ramlan. Sandy, M Azhar Lihan. Kartika, DGT. Firdaus, Davi (2020). Jurnal Swabumi. Vol 8 No 2. P. 106-113. ISSN: 2355-990X.