The Contractor's Role in Mitigating Disasters in Cianjur City, West Java, Indonesia's Ciawi Road Project
Downloads
Construction projects for road infrastructure are typically undertaken outside and are very susceptible to unforeseen circumstances, such as natural catastrophes. An extensive workforce, high-quality building supplies, and schedule-driven construction implementation strategies were employed by the contractor to complete this project. The purpose of this research was to discover the steps that contractors need to follow in the event of a natural disaster while they are in the process of building, in order to prevent losses for them. The Ciawi Road Project in Cianjur, West Java, serves as the research case study. Ten variables can be used by contractors as preventive measures for disaster management for other contractors and other civil projects, according to data obtained from a questionnaire method and analysis using SPSS statistics.
Ambiya, Firhan., Malahayati, N., Nurisra., (2021). “Tingkat Risiko Konstruksi dari Faktor Tenaga Kerja, Material dan Peralatan pada Rekonstruksi Rumah Pasca Bencana Gempa di Kabupaten Pidie Jaya”. Journal of The Civil Engineering Student, 3 (3), 274-281.
Elfitri, Resi., Suraji, Akhmad., Hakam, Abdul., (2016). “Kontribusi Kontraktor terhadap Pengurangan Risiko Kegagalan Bangunan Akibat Gempa di Kota Padang”. Jurnal Rekayasa Sipil, 12 (1), 49-58.
Kumar, Arun., Desha, Cheryl., (2013). “Sustainbility In Post Disaster Road Infrastructure Recovery Projects In Queensland, Australia”. IIIRR Conference, 1, 1-10.
Lili, Xi., Zhe, Que., (2018). “On civil engineering disasters and their mitigation”.
Earthquake Engineering and Engineering Vibration, 17 (1), 1-10. 5)
Pamidimukkala, A., Kermanshachi, S., Karthick, S., (2020). “Impact of Natural Disasters on Construction Projects: Strategies to Prevent Cost and Schedule Overruns in Reconstruction Projects”. Proceedings of the Creative Construction e-Conference, 61, 103-110.
Prieto, Bob., Whitaker, Charles., (2020). “Post Disaster Engineering and Construction Program and Project Management”. PM World Journal, 9 (7), 1-19.
Rifai, Andri I., Prasetyo, Eko G., Thalib, Hikmawati., (2022). “Implementasi Perencanaan dan Pelaksanaan Rehabilitasi dan Rekonstruksi Jalan Pasca Bencana Gempa dan Liquefaksi”. Proceeding Civil Engineering Research Forum, 2 (1), 42-50.
Safapour, Elnaz., et al., (2020). “A Damage-Based Analysis of Rework in Reconstruction of Infrastructure Projects Due to Natural Disasters”. Proceedings of the Creative Construction e-Conference, 49, 2-10.
Wirabakti, Deden Matri., dkk., (2014). “Studi Faktor-faktor Penyebab Keterlambatan Proyek Konstruksi Bangunan Gedung”. Jurnal Konstruksia, 6 (1), 15-29.
Zulfiar, Muhammad Heri., Jayady, Arman., (2018). “Kajian Kerentanan pada Sektor Konstruksi dalam Pengurangan Risiko Bencana Gempa Bumi”. Jurnal Karkasa, 4 (1), 1