Comparison of Probability Impact Matrix and Fuzzy Logic Methods for Risk Analysis of Rural Infrastructure Projects in Indonesia
Downloads
Through the provision of facilities and infrastructure in the Village, it can be used as an effort to empower the community to accelerate regional economic development that is effective and robust. In its implementation, infrastructure projects have risks that can have an impact on the sustainability of the project. Therefore the research aims to analyze what are the most influential risk factors in Participatory-Based Rural Infrastructure Projects using the PIM (probability impact matrix) and Fuzzy Logic Methods. This research uses a descriptive method with a qualitative and quantitative approach. The collected data will be analyzed using the Fuzzy Logic method. The results of the identification of risk factors for infrastructure projects were identified as many as 23, but after validating the risk identification for rural infrastructure projects, there were 17 identified risk factors. Based on the results of the analysis using the risk matrix, 17 factors have values that tend to be small and overall are at a moderate level. However, after analysis using the Fuzzy Logic method, the risk factor values varied, and there were 8 risk factors that were at a high level, these risk factors included technological failure, land change, negligent social behavior, bad design, inappropriate materials, inappropriate methods, inappropriate Standard Operating Procedures.
Andi, “Pembangunan Infrastruktur Perdesaan Dengan Pelibatan,” Jurnal SMARTek, vol. 7, no. 4, pp. 292 - 300, 2009.
N. N. Rodhi, “Risk Analysis of Surabaya–Bojonegoro Highway Improvement,” Civilla: Jurnal Teknik Sipil Universitas Islam, vol. 7, no. 1, pp. 57-64, 2022.
N. N. Rodhi, I. P. A. Wiguna and N. Anwar, “DISASTER RISK MITIGATION OF OIL AND GAS PIPELINES PROJECT IN JAVA ISLAND INDONESIA,” ARPN Journal of Engineering and Applied Sciences, vol. 14, no. 24, pp. 4160 - 4163, 2019.
M. Abednego and S. Ogunlana, “Good Project Governance for Proper Risk Allocation in Public – Private Partnership in Indonesia,” International Journal of Project Management, vol. 24, pp. 622 - 634, 2006.
S. Zolfagharian, M. Nourbakhsh, J. Irizarry, A. Ressang and M. Gheisari, “Environmental Impacts Assessment on Construction Sites,” in Construction Research Congress , 2012.
S. Gohar, K. M, J. M. P and J. A. A. S, “Construction Projects Risk Assessment Based On Fuzzy AHP,” in student conference on research and development (SCOReD 2009), UPM Serdang., 2009.
N. J. Duijm, “Recommendations on the use and design of risk matrices,” Safety Science, 2015.
N. N. Rodhi, J. Utomo and W. Agung, “KAJIAN RISIKO PENGGUNAAN SUMBER DAYA AIR BERBASIS PARADIGMA BOTTOM-UP APPROACH (Studi Kasus Wilayah Eksplorasi Banyu Urip – Bojonegoro),” Universitas Diponegoro, Semarang, 2012.
M. Labombang, “Manajemen Risiko Dalam Proyek Konstruksi,” Jurnal SMARTek, vol. 9, no. 1, p. 39 – 46, 2011.
L. Bing, A. Akintoye, P. Edwards and H. C, “The Allocation of Risk in PPP/PFI Construction Project in The UK,” nternational Journal of Project Management, vol. 23, no. 25 - 35, 2005.
S. Mojtahedi, S. Mousavi and A. Makoui, “Risk Identification and Analysis Concurrently: Group Decision Making Approach,” in Proceedings of the 2008 IEEE, 2008.
H. Tong-yin, H. Wei and S. Ying-hua, “Risk Evaluation of Public-Private Partnership Projects of Urban Rail Transit Based on Fuzzy Comprehensive Evaluation Method,” in Proceeding of the2011 International Conference on Management and Service Science, 2011.
Y. Xu, Y. Yang, A. Chan, J. Yeung and H. Cheng, “Identification and Allocation of Risks Associated with PPP Water Projects in China,” International Journal of Strategic Property Management, vol. 15, no. 3, pp. 275 - 294, 2011.
G. Dag and M. Bagriyanik, “he Effect of Different Fuzzy Membership Function Forms on Controlling Loop Flows,” in IEEE, 2009.
N. N. Rodhi, “Model Analisis Risiko Proyek Jaringan Pipa Migas Onshore Untuk Sustainable Construction Di Pulau Jawa,” ITS Surabaya, Surabaya, 2021.
D. Grimsey and M. Lewis, “Evaluating The Risks of Public Private Partnership for Infrastructure Projects,” International Journal of Project Management, vol. 20, no. 2, pp. 107 - 118, 2001.
L. Shen, A. Platten and X. Deng, “Role of Public Private Partnership to Manage Risks in Public Sector Projects in Hong Kong,” International Journal of Project Management, pp. 587-594, 2006.
M. Zhang, M. Zhu and X. Zhao, “Recognition of High-Risk Scenarios in Building Construction Based on Image Semantics,” Journal of Computing in Civil Engineering, vol. 34, no. 4, 2020.