The Impact of Construction Material Supply Delays on Contractor X in Jakarta, Indonesia
Downloads
Construction materials are the main component in the physical implementation of the work, so their availability on time, in the right amount, and according to specifications greatly affects the smooth running of activities in the field. Without good planning and management of material procurement, projects are at risk of delays, cost overruns, and even a decrease in the quality of work results. In addition, an inefficient procurement system can cause disruptions to work schedules, reduce labor productivity, and trigger conflicts between contractors, suppliers, and project owners. This research was conducted at contractor X using a survey method (questionnaire) to determine the Impact of Material Supply Delays. The results indicated a positive relationship between the variables “Delay in Supply of Construction Materials” (X) and “Impact on Contractor X” (Y) with a regression equation Y = 11.524 + 0.141X. While the correlation also shows a positive relationship between the two variables. This is a very meaningful input for contractor X, so they must make careful planning regarding the supply of construction materials for each project undertaken.
Ariyanto, Arief Subakti. (2019). Pengaruh Keterlambatan Material terhadap Risiko Proyek Pembangunan Gedung Parkir.
(The Effect of Material Delay on the Risk of Parking Building Construction Project)
vol.05/2/oktober/2019, 51-58.
Chudley, R., & Greeno, R. (2006). Building Construction Handbook (6th ed.). Elsevier.
Darasepti, Chicy Intan. (2022). Faktor – faktor Keterlambatan Material Pada Proyek Peningkatan Jalan Trumon Batas Singkil (Factors of Material Delay in the Trumon Batas Singkil Road Improvement Project) vol. 3 no. 1 juni, 68-73.
Ervianto, W. I. (2007). Manajemen Proyek Konstruksi (Construction Project Management). Yogyakarta: Andi.
Hendrickson, C. (2000). Project Management for Construction: Fundamental Concepts for Owners, Engineers, Architects and Builders (Version 2.2). Pittsburgh: Carnegie Mellon University.
Hardina, N. (2022). Manajemen Rantai Pasok Material Terhadap Keterlambatan Pelaksanaan Proyek Konstruksi Jalan (Material Supply Chain Management on Delays in Road Construction Project Implementation). Jurnal Ilmiah Teknik Unida, 3(1), 49-59.
Huqban, A., & Suhendi, C. (2020). Analisis Keterlambatan Penyediaan Material Terhadap Ketepatan Waktu Pembangunan (Analysis of Delays in Material Supply on Construction Timeliness). Jurnal TESLINK: Teknik Sipil dan Lingkungan, 2(1), 35-43.
Illingworth, J. R. (1993). Construction Methods and Planning. E & FN Spon.
Jackson, N., & Dhir, R. K. (1996). Civil Engineering Materials. MacMillan Press.
Mamlouk, M. S., & Zaniewski, J. P. (2011). Materials for Civil and Construction engineers (3rd ed.). Pearson Prentice Hall.
Mehta, P. K., & Monteiro, P. J. M. (2014). Concrete: Microstructure, Properties, and Materials (4th ed.). McGraw-Hill Education.
Neville, A. M., & Brooks, J. J. (2010). Concrete technology (2nd ed.). Pearson Education.
Saputra, Ramdhan Yundra. (2017). Analisa Faktor Penyebab Keterlambatan Penyelesaian Proyek Pembangunan Mall ABC (Analysis of Factors Causing Delay in Completion of ABC Mall Construction Project). Diss. Institut Teknologi Sepuluh Nopember.
Soeharto, I. (1999). Manajemen Proyek: Dari Konseptual sampai Operasional. (Project Management: From Conceptual to Operational). Jakarta: Erlangga.